housetec
Call us any time (+254) 725 390 146

HEALTHCARE FACILITIES

_
Clients:
The Nairobi Hospital
Category:
Healthcare Facility
Status:
Completed
Location:
Nairobi, Kenya

THE NAIROBI HOSPITAL PROJECTS

๐Ÿ“‹ PROJECT DESCRIPTION

Specialized carpet repair works in the Critical Care Unit of one of Kenya's premier healthcare institutions. This project required exceptional care, precision, and adherence to strict medical facility protocols. The CCU is a sensitive environment where patient health and infection control are paramount.

The project involved repairing and replacing Altro medical-grade flooring in a functioning critical care unit, requiring minimal disruption to hospital operations and strict compliance with healthcare standards.

๐Ÿ”ง SERVICES PROVIDED

ย 
ย 
ServiceDescriptionHealthcare Consideration
Altro Carpet RepairSpecialized medical-grade flooring repairInfection control compliant
Medical-Grade Material InstallationHealthcare-approved flooring materialsAnti-bacterial properties
Infection Control ComplianceStrict adherence to hospital protocolsSterile environment maintenance
Minimal Disruption ExecutionPhased work to maintain CCU operationsPatient safety priority
Seamless Joint FinishingCreating smooth, cleanable surfacesPrevents bacterial growth
Anti-Slip Surface TreatmentSafety flooring for medical environmentPatient and staff safety
Waste ManagementControlled removal of old materialsBiohazard protocols
Quality AssurancePost-installation testing and inspectionHealthcare standards verification

๐Ÿ† KEY ACHIEVEMENTS

  • Successfully completed work in active Critical Care Unit

  • Zero infection incidents during or after project

  • Maintained full CCU operations throughout

  • Met all healthcare compliance requirements

  • Enhanced patient and staff safety with new flooring

  • Delivered to strict hospital standards